Data Center Locations: Latin America Projects


Brazil


Brazil


Data Center: CIPD Petrobras Location: Rio do Janeiro (Brazil) Operator: Petrobras (Brazilian oil company) Use: Internal IT Status: Phase one opened October 2010 Size: 27,000 sq m (3,700 sq m IT space) Tier rating: Tier III Power source: 6MVA


Data Center: Ativas Data Center (2010) Location: Belo Horizonte, Minas Gerais Operator: Ativas Cost: US$50m Use: Colocation and data center services Status: Operational Q2 2010 Size: 6,000 sq m (1,500 sq m of data center space) Tier rating: Tier III Other ratings: Certifi cation TÜV Rheinland Power source: 7.5 MVA, three stages of growth of 2.5 MVA Connectivity: Four connections (will build out to six)


Brazil


Mexico


Data Center: Hortolandia Tecnological Center Location: Hortolandia Operator: IBM Brazil Use: Outsourced IT services Status: Last data room built in Q1 2010 Size: 11 data center rooms Other ratings: IBM ratings of 3+ for reliability and concurrent maintenance Connectivity: Multiple connections with global reach using fi ber optic connections


Data Center: KIO 5/6 Location: Santa Fe, Distrito Federal, Mexico Operator: KIO Networks Cost: US$30m Use: Infrastructure services Status: Commenced operations Q1 2011 Size: 1,500 sq m data center space Tier rating: Tier IV Other ratings: ITIL, SAS70, Type II, ISO 20000, ISO 27001, Security Systems DOD 6. Power source: 210 watt s per sqf (+8 kw per cabinet)


Brazil


Chile


Data Center: Alog Datacenters do Brasil Location: Sao Paolo Operator: Alog (now an Equinix company) Cost: R$25m (building and hardware) Status: Commenced operations 1 June 2011 Size: 3,200 sq m (800 sq m phase 1) Tier rating: Tier III Other ratings: CSA: Certifi cate of Cloud Security Knowledge and Uptime Institute: ATS - Accreditation Tier Specialist Power source: 12MW


Data Center: Entel Location: Ciudad de los Valles Operator: Entel Cost: US$20m Use: Colocation and data center services Status: Phase one completed May 2010, more phases planned in next eight years Size: Phase one 2,000 sq m, 8,000 sq m in four buildings once complete Tier rating: Tier III Other ratings: Seismic factor 1.5, ISO 27.000.


50 www.datacenterdynamics.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56