Data Center Locations: Europe Projects
UK
Switzerland
Data Center: NYSE Euronext Location: Basildon Operator: NYSE Euronext Cost: US$500m split between Basildon and a new data center in Mawah, New Jersey Use: Internal NYSE systems 20%, 80% wider market hosting Status: Consolidation project – migration completed November 2010 Size: 400,000 sq ft Power Source: 3MW per 10,000 sq ft module Connectivity: Connections to smaller colo operations (‘liquidity hubs’) and NYSE Euronext cash equities market and other services with 10GbE
Data Center: DeepGreen Location: Mollis Operator: DeepGreen Use: Colocation and hosting Status: Construction commenced early 2011 Size: 12,000 sq m fl oor space Other ratings: Planned PUE 1.1 Power Source: 8kW/rack
Spain
Ireland
Data Center: D-ALiX Location: Canary Islands Operator: D-ALiX Use: Data center hosting Status: Phase one fi nished February 2011, phase two being constructed Size: Phase one 2,500 sq m, phase two 5,000 sq m Tier: Tier III (plans to increase to Tier IV) Power Source: 200KVA (20MW PV and 13 MW wind power installed at location) Other ratings: PUE 1.5 expected to be 1.2 at end of expansion Connectivity: Submarine cable and terrestrial fi ber
Data Center: Microsoft Dublin Location: Dublin, Ireland Operator: Microsoft Cost: $500m Use: Cloud/application delivery Status: Completed 2009 Power Source: 22.5MW
France
UK
Data Center: Condorcet Location: Paris Operator: TelecityGroup Cost: €48m Use: Colocation Status: Opened January 2010 Size: 3,400 sq m Tier rating: Tier IV Other ratings: ISO 2700:2005 and ISO 9001:2008 and designed to OHSAS 18001 and ISO 14001 Power Source: 6.4MW (waste energy heats an adjoining arboretum) Connectivity: Houses the France-IX
Data Center: Chesham Location: Chesham Operator: Matt erhorn Capital DC Management Cost: £250m Main Use: DC Status: Redesign currently in planning due Q3 11 Size: (fl oor space) 90,000 net tec and two buildings of 115,000 sq ft GIA Tier Rating: 3/4 Total Power: 25 mva on site Connectivity: Targeting sub millisecond connectivity to City of London
40
www.datacenterdynamics.com
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56