Data Center Locations: Europe Projects


UK


Switzerland


Data Center: NYSE Euronext Location: Basildon Operator: NYSE Euronext Cost: US$500m split between Basildon and a new data center in Mawah, New Jersey Use: Internal NYSE systems 20%, 80% wider market hosting Status: Consolidation project – migration completed November 2010 Size: 400,000 sq ft Power Source: 3MW per 10,000 sq ft module Connectivity: Connections to smaller colo operations (‘liquidity hubs’) and NYSE Euronext cash equities market and other services with 10GbE


Data Center: DeepGreen Location: Mollis Operator: DeepGreen Use: Colocation and hosting Status: Construction commenced early 2011 Size: 12,000 sq m fl oor space Other ratings: Planned PUE 1.1 Power Source: 8kW/rack


Spain


Ireland


Data Center: D-ALiX Location: Canary Islands Operator: D-ALiX Use: Data center hosting Status: Phase one fi nished February 2011, phase two being constructed Size: Phase one 2,500 sq m, phase two 5,000 sq m Tier: Tier III (plans to increase to Tier IV) Power Source: 200KVA (20MW PV and 13 MW wind power installed at location) Other ratings: PUE 1.5 expected to be 1.2 at end of expansion Connectivity: Submarine cable and terrestrial fi ber


Data Center: Microsoft Dublin Location: Dublin, Ireland Operator: Microsoft Cost: $500m Use: Cloud/application delivery Status: Completed 2009 Power Source: 22.5MW


France


UK


Data Center: Condorcet Location: Paris Operator: TelecityGroup Cost: €48m Use: Colocation Status: Opened January 2010 Size: 3,400 sq m Tier rating: Tier IV Other ratings: ISO 2700:2005 and ISO 9001:2008 and designed to OHSAS 18001 and ISO 14001 Power Source: 6.4MW (waste energy heats an adjoining arboretum) Connectivity: Houses the France-IX


Data Center: Chesham Location: Chesham Operator: Matt erhorn Capital DC Management Cost: £250m Main Use: DC Status: Redesign currently in planning due Q3 11 Size: (fl oor space) 90,000 net tec and two buildings of 115,000 sq ft GIA Tier Rating: 3/4 Total Power: 25 mva on site Connectivity: Targeting sub millisecond connectivity to City of London


40 www.datacenterdynamics.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56