Data Center Locations: Europe Projects
UK
Spain
Data Center: Merlin Location: Swindon Operator: Capgemini Cost: £12m phase one, overall investment about £28m Use: Colocation Status: Phase one online September 2010 Size: Phase one 10,000 sq ft, total build to be 30,000 sq ft Tier rating: Tier III Other ratings: PUE 1.08 expected to be 1.01 by end of 2011, built to LEED standard Power: 1,000W per sq m
Data Center: Walhalla Location: Valencia Operator: Tissat Use: Data center services and colocation Status: Due to open July 2011 Size: 500 sq m phase 1, stage two will add another 500 sq m Tier rating: Tier IV Other ratings: LEED, Follows EU Code of Conduct for Data Centres Power source: Trigeneration power providing 6.500watt s per rack
Netherlands
Iceland
Data Center: EvoSwitch Data Center Location: Haarlem, Amsterdam Operator: EvoSwitch Use: Colocation Status: Phase three completed January 2011 Size: 10,000 sq m operational space with ability to build to 40,000 sq m Tier: Tier III Other rating: PUE 1.2 Power Source: 25-40MVA Other ratings: PUE 1.5 expected to be 1.2 at end of expansion Connectivity: 35 carriers
Data Center: Thor Datacenter Location: Reykjavik Operator: Thor Use: Colocation, backup, cloud services Status: Opened 21 May 2010 Size: 28,000 sq ft Tier rating: Tier III Other rating: Designed to achieve PUE 1.14 (1.07 at night), ISO27001 Power Source: 30kWh per rack with dual grid connections (100% renewable)
Connectivity: Multiple fi ber connections by Mila and Farlce with internet peering in London and Copenhagen. Connections of 10Gb
UK
Finland
Data Center: NGD 1 Location: Newport, Wales Operator: Next Generation Data Europe Cost: US$130m Use: Colocation and managed hosting Status: Currently building out another 420,000 sq ft Size: 75,000 sq ft with 420,000 sq ft currently under construction Tier rating: Tier III Other rating: BREEAM, Energy Star equipment, ISO27001 Power Source: 90MVa/400Kv Cost: 420,000 sq ft extension £12m Connectivity: Low latency dark fi berfi ber, carrier neutral
Data Center: Google Finland Location: Hamina, Finland Cost: Estimated: €250m – Site cost: $51m Acquired 2009 Use: Web search/application delivery Size: Total Site: 400 acres Status: Scheduled to be operational 2011 Cooling: 100% cooled with Sea Water
www.datacenterdynamics.com 37
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56