Spain


Data Center: Merlin Location: Swindon Operator: Capgemini Cost: £12m phase one, overall investment about £28m Use: Colocation Status: Phase one online September 2010 Size: Phase one 10,000 sq ft, total build to be 30,000 sq ft Tier rating: Tier III Other ratings: PUE 1.08 expected to be 1.01 by end of 2011, built to LEED standard Power: 1,000W per sq m


Data Center: Walhalla Location: Valencia Operator: Tissat Use: Data center services and colocation Status: Due to open July 2011 Size: 500 sq m phase 1, stage two will add another 500 sq m Tier rating: Tier IV Other ratings: LEED, Follows EU Code of Conduct for Data Centres Power source: Trigeneration power providing 6.500watt s per rack


Netherlands


Iceland


Data Center: EvoSwitch Data Center Location: Haarlem, Amsterdam Operator: EvoSwitch Use: Colocation Status: Phase three completed January 2011 Size: 10,000 sq m operational space with ability to build to 40,000 sq m Tier: Tier III Other rating: PUE 1.2 Power Source: 25-40MVA Other ratings: PUE 1.5 expected to be 1.2 at end of expansion Connectivity: 35 carriers


Data Center: Thor Datacenter Location: Reykjavik Operator: Thor Use: Colocation, backup, cloud services Status: Opened 21 May 2010 Size: 28,000 sq ft Tier rating: Tier III Other rating: Designed to achieve PUE 1.14 (1.07 at night), ISO27001 Power Source: 30kWh per rack with dual grid connections (100% renewable)


Connectivity: Multiple fi ber connections by Mila and Farlce with internet peering in London and Copenhagen. Connections of 10Gb


UK


Finland


Data Center: NGD 1 Location: Newport, Wales Operator: Next Generation Data Europe Cost: US$130m Use: Colocation and managed hosting Status: Currently building out another 420,000 sq ft Size: 75,000 sq ft with 420,000 sq ft currently under construction Tier rating: Tier III Other rating: BREEAM, Energy Star equipment, ISO27001 Power Source: 90MVa/400Kv Cost: 420,000 sq ft extension £12m Connectivity: Low latency dark fi berfi ber, carrier neutral


Data Center: Google Finland Location: Hamina, Finland Cost: Estimated: €250m – Site cost: $51m Acquired 2009 Use: Web search/application delivery Size: Total Site: 400 acres Status: Scheduled to be operational 2011 Cooling: 100% cooled with Sea Water


www.datacenterdynamics.com 37


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56