This page contains a Flash digital edition of a book.
Fatima Enterprise Strategy


Stage One Report


March 2008


Notice


This report was produced by Atkins Ltd for Fatima Regeneration Board for the specific purpose of the Fatima Enterprise Strategy.


This report may not be used by any person other than Fatima Regeneration Board without Fatima Regeneration Board’s express permission. In any event, Atkins accepts no liability for any costs, liabilities or losses arising as a result of the use of or reliance upon the contents of this report by any person other than Fatima Regeneration Board.


Document History JOB NUMBER: 506 0149 2 1


Final Report Draft Report


Revision Purpose Description


S Cox S Cox


DOCUMENT REF: Stage One Report J Copley


R Somerville Originated Checked Reviewed


S Cox S Cox


31.03.08 21.02.08


Authorised Date


506 0149/2008 03.31 - Fatima Enterprise Strategy, Stage 1 - FINAL.doc


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44