This page contains a Flash digital edition of a book.
CMYK 22 - 28 November | 2010 | Projects Info


Sl. no.


16 Organisation


EPC/CIVIL WORKS/FENCING/WALL WORKS South Eastern Railway


Location State


Tender Value (Rs)


Chakradhapur Jharkhand


Details: 22/2010-11 (sr. no. 10): Construction of boundary wall at DPS, NOMD, BJMD, GX, BBN, BYX, DJHR, BSPX and JRLI yard long with construction of goomty and barrier to protect railway public siding under the jurisdication of ADEN/ DPS.


17 Department of Animal Husbandry & Fisheries Ranchi Jharkhand


Details: Expression of Interest for installation of Pre-fabricated puf pannel structure of portable milk booth mounted on IPS floor (size-3000 mm x 3000 mm x 2700mm) at different districts of Jharkhand.


18 19 Military Engineer Services Tamil Nadu Cements Corporation Ltd Ahmednagar Chennai Maharashtra


Details: 84057/E8: Provision of certain building works, hard standing, RCC bridge and other miscella- neous structures at KK range (AF) Ahmednagar. Completion period: 72 weeks.


Tamil Nadu


Details: TANCEM/MM/37/2010 (sr. no 03): Main plant and machineries for modernisation of alangulam cement works 1200 TPD dry process plant. Completion period: 14 months.


PLUMBING/DRAINAGE/SANITARY WORKS 20


Government of Andhra Pradesh, Irrigation and CAD Department


21 Delhi Jal Board Vijayawada Andhra Pradesh NA


Details: 60/2010-11 (sr. no. 01): Modernization of Budameru (in falling drains of modernization minor drain) including structures from km 0.000 to km 25.600.


New Delhi Delhi


Details: 07 (2010-2011): Rehabilitation of ring road sewage pumping station by S/I/T/C of 4 nos. 20 MGD &2 nos. 30 MGD pumps alongwith allied electrical panels & accessories make:- jyoti / kirloskar / mather & platt / beacon weir /WPIL /KSB / flowmore. Completion period: 6 to 8 months.


22 23 South Eastern Railway Chakradhapur Jharkhand


Details: 22/2010-11 (sr. no. 03): Improvement to drainage system at porter Kholi and loco colony at Ckakradharpur.


Government of Kerala, Irrigation (Minor) Department Thiruvananthapuram Kerala


Details: 32/SEMI/2010-2011 (sr. no. 05): Improvements to Perakulam and side protection work of side drain in Kudappanakunnu panchayath (Thiruvananthapuram). Class of contractor: “B” class and above. Completion period: 4 months.


POWER 24 Power Grid Corporation of India Ltd Gwalior Madhya Pradesh NA


Details: CC-CS/120-WR2/RT-715/3/G5): Tenders are invited for supply, erection, testing & commissioning for 12x80 MVAR 765 KV shunt reactor along with associated NGRS & SAS and 3x80 MVAR 765 KV bus reactors at Satna S/S and 9x80 MVAR 765 KV shunt reactor along with associated NGR & SAS at Gwalior substation (Package-R2 Under Transmission system Associated with Rihand-III & Vindhyachal-IV TS.


25 26


RESIDENTIAL/COMMERCIAL BUILDINGS Tirumala Tirupati Devasthanams, Tirupati


NA 09/12/2010 16/12/2010 / 16/12/2010


Contact: DGM (CS-G5), Powergrid, Saudamini, Plot No. 2, Sector-29, Gurgaon-122001, Haryana. Tel: 0124-2571700-19, Fax: 2571831


NA / 07/12/2010 07/12/2010 / 10/12/2010 Contact: Superintending Engineer, Irrigation Circle, Vijayawada, Andhra Pradesh. Tel: 0866-2575276 53,953,998 1,080,000 / NA 29/11/2010 29/11/2010 / 30/11/2010


Contact: Executive Engineer (SDW) I, Kilokri SPS : Jal Vihar : Lajpat Nagar : New Delhi-110024, Delhi. Tel: 011-29811360


6,829,725 2,500,000 136,600 / 5,000 50,000 / 3,800 08/12/2010 01/12/2010 08/12/2010 / 08/12/2010 Contact: Divisional Railway Manager (Engg.), Chakradhapur, Jharkhand. Tel: 06587-238026 01/12/2010 / 01/12/2010


Contact: B. Jayaram, Superintending Engineer, Minor Irrigation circle, 5th Floor, Jalavijnana Bhavan, Ambalamukku, Kowdiar P.O., Thiruvananthapuram-03, Kerala. Tel: 0471-2433752


19,977,850


EMD / Doc Cost (Rs)


249,890 / 5,000 Tenders |15 Document Date


Submission / Opening Date


08/12/2010 08/12/2010 / 08/12/2010 Contact: Divisional Railway Manager (Engg.), Chakradhapur, Jharkhand. Tel: 06587-238026, 239526 NA NA 26/11/2010 26/11/2010 / 26/11/2010


Contact: Assistant Director (Dairy), Room No-215, Nepal House, Doranda, Ranchi - 834002, Jharkhand. Tel: 0651-2490929


14,800,000 NA 222,000 / 1,000 1,000,000 / 10,000 04/12/2010 05/01/2011 04/12/2010 / 07/01/2011


Contact: Shri Hari Singh, Director (Contracts), Ahmednagar, Maharashtra. Tel: 020-26362267, Fax: 26362267.


05/01/2011 / 05/01/2011


Contact: Manager (Materials), L.L.A building, II-Floor, 735, Anna Salai, Chennai-600 002, Tamil Nadu. Tel: 044-28525461, Fax: 28523991


Chittoor Government of Andhra Pradesh, Panchayat Raj Department Hyderabad


Andhra Pradesh


Details: 136/SE-II/TTD/2010-11 (sr. no. 04): Beautification and development of Narayanagiri garden and Alwar tank at Tirumala. Completion period: 6 months.


Andhra Pradesh


Details: 2/NCRMP/NB10/CE (NABARD)/2010-11 (sr. no. 03): Construction of cyclone shelters at Amalpadu, Angavanipeta, Ch. Batsalavanipeta, Chintavanipeta, U. Narasingupalli. Package no: NCRMP/ B-W/AP/MPCS/PRED/01/V.Kothuru/003. Completion period: 9 months.


27 Government of Andhra Pradesh, Panchayat Raj Department Hyderabad Andhra Pradesh


Details: 2/NCRMP/NB10/CE (NABARD)/2010-11 (sr. no. 04): Construction of cyclone shelters at Bypalli, Chinavanka, Chinnakothuru, Chinnnajittuval palam. Package no: NCRMP/B W/AP/MPCS/ PRED/01/V.Kothuru/004. Completion period: 15 months.


28 29 Military Engineer Services Military Engineer Services Hyderabad Dahung Andhra Pradesh


Details: 8139/02/E8: Provision of of Arborticulture to Sekhon block at AFA Hyderabad. Completion period: 24 weeks.


Details: 8470/E8: 1) Special repair to building no CH 02 at Sange. 2) Construction of toilet block with 1xEWC, 1xurinal 1xWHB for offr and PVC water tank with staging near Bn office at Dahung. 3) Provision of tiling in floor incl toilet in building no TW-231 and T- OPT-65 (office building) at Dahung. 4) Provision of ceiling, cladding and including wiring in JCO s mess in bldg No T/6A at Tenga under GE 859 EWS. Completion period: 24 weeks.


30 East Central Railway Samastipur Bihar


Details: TC/11 of 2010 (Open) (sr. no. 03): Improvement of sitting arrangement and provision/ extension of P.P shelter in the jurisdiction of Sr. DEN/ I/ Samastipur, provision of benches on P.F. no. 1, 1A, 2, UTS waiting hall, PRS hall etc in the jurisdiction of ADEN/I/Darbhanga. Completion period: 6 months.


31 Public Works Department Jhabua Madhya Pradesh


Details: 2078 and 18(1)/sac/2010-11Jhabua: Upgradation of community health center upto 30 beded hospital Kalyanpura, district Jhabua. Class of contractor: A-II to A-V.


10,500,000 8,400,000


NA 84,000 / 10,000


04/12/2010 14/12/2010 Contact: Chief Engineer, Hyderabad, Andhra Pradesh. Tel: 040-23396655 30,300,000 303,000 / 10,000 14/12/2010 Contact: Chief Engineer, Hyderabad, Andhra Pradesh. Tel: 040-23396655 640,000 Arunachal Pradesh 1,050,000 12,800 / 500 21,000 / 500 07/12/2010 08/12/2010 07/12/2010 / 07/12/2010 Contact: Garrison Engineer (AF), Hyderabad, Andhra Pradesh. Tel: 040-254202, Fax: 254202 08/12/2010 / 08/12/2010


Contact: Ranjith G Nair, Garrison Engineer, Dahung, Arunachal Pradesh. Tel: 0378-2273304, Fax: 22273304


14/12/2010 / 14/12/2010


04/12/2010 / 04/12/2010


Contact: M. Ramesh Reddy, Superintending Engineer - II, Chittoor (Dist), Andhra Pradesh. Tel: 0877- 2264268, 2264367.


14/12/2010 / 14/12/2010


5,136,427


102,730 / 5,000


14/12/2010


14/12/2010 / 14/12/2010 Contact: Divisional Railway Manager (Engg.), Samastipur, Bihar. Tel: 06274- 222390, Fax: 222390 13,993,000 139,930 / NA 26/11/2010 26/11/2010 / 10/12/2010


Contact: Yogendra Bagole, Executive Engineer, PW Division, Jhabua, Madhya Pradesh. Tel: 0731- 244213


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20