This page contains a Flash digital edition of a book.
INDOOR FLOORING

eration is the primary sport played at the venue, but another key issue is how regular maintenance fits into the Whole Life Cost Analysis (WLCA) of the project, which accounts the whole cost of a build- ing – not just the construction outlay. According to Darren Wood, Gerflor

national sales manager, facility owners need to understand how long a floor is expected to last within the asset plan of the building, then take account of the costs for design, installation, mainte- nance and planned major works right through to disposal and re-installation. “All these costs can be added together

and a square metre WLCA can be calcu- lated,” Wood explains. “The capital cost of a sports floor only represents a small part of the pie, so it’s worth looking at regular maintenance costs too, as the ‘lowest cost now’ culture is incompatible with long-term profitability, operational efficiency and consumer satisfaction.” Different sports require different types of flooring surfaces, for example,

62 Read Sports Management online sportsmanagement.co.uk/digital

Maintaining

W

INDOOR SPORTS FLOORING

Cleaning and maintenance can be an important consideration when specifying a sports floor. Karen Maxwell finds out what’s involved

hen determining the floor- ing requirements within a sports facility the major factor to take into consid-

sprung timber is best for basketball and synthetic is more suited to badminton. However, the majority of sports floors in the UK are specified as multi-sport sur- faces that can cope with a multitude of sporting disciplines such as indoor hock- ey, tennis, badminton, netball, volleyball, basketball and cricket, so a sensible com- promise in flooring is called for. To achieve value from a sports floor,

Wood recommends that the end use or client needs to be involved early in the

decision-making process. “Especially when a decision involves a compromise between the client’s functional sporting requirements, the technical viability, the economic performance and the environ- mental impact,” he explains. “It makes sense to understand what’s required from the type of sports hall surface chosen and the impact maintenance will have over the short, medium and long-term.” Depending on the flooring chosen, some surfaces may cost more in the

Junckers flooring was chosen for Knowsley schools in the Building Schools for the Future programme

Issue 2 2010 © cybertrek 2010 Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84
Produced with Yudu - www.yudu.com