Salem Community Patriot
8 - February 12, 2010
Tonull Meetinnullnullontinued nullom nullont nullnull
staff photo by Robyn Hatch
Street nullidge onuller nullidow Harris nulloonullwas built in nullnull and will also help in dealing with these answers out immediately. null
last rebuilt in nullnull. The enullsting parapet walls are signinullantly the nullS in the Townnulls search for was also asnulld if there would be
deteriorated. The location was subnullct to a partial collapse during alternatinulle water sources at the a maintenance and replacement
the nully nullnull nullod and was temporarily closed until interim repairs state lenullel. program for indinullduals, and would
could be conducted to reopen the road to trafnull. The current bridge Funding Sourcenull There is it be possible to nullst replace one
is structurally inadenullate and hydraulically denullient and the interim no water or sewer rate impact indinulldual meter instead of the whole
repairs are nearing their functional lifespan. nullior appropriations in nullnull. The rate may need town. This was dropped nullicnully.
hanulle facilitated the adnullancement of a design for replacement of to be adnullsted in nullnull or Hydro nullsh was enulllained. nullst
the enullsting structure. nullnew structure is proposed to replace the nullnull, depending upon when water not accounted for. null was stated
outdated facility and to impronulle hydraulic function. the nullst loan payment is due. that the wireless might still need
. nullff, nullrector of nullgineering, shonull wed slides of the structure The interest rate on this loan route collection and receinullers will
problems. null is estimated that null percent will be reimbursed by is nullnullpercent onuller a nullnullear be on water towers. nullcause this is
state in nullnull. nullentually, all null bridges will hanulle to be replaced term. nullditionally, this loan still so new, it was stated that there
in Salem because of structural damage. null. nullyons stated that there may nullalify for nullnullercent are still many unanswered nullestions
was actually a small decrease in cost due to a new engineer. null forginulleness on the nullalinulld being wornulld on. This new meter is
emphasis was stated onuller and onuller again about how the masonry principal balance. a simple hoonullup procedure, but it
in all bridges was nullery cracnulld and not supporting their weight. . nullnullide and nullnull . Richard was stated that it would tanull about
This wornullneeds to be done. Stephen Campbell stood up and Russell sponull about the pronullct one hour per household (nullnullnullplus
commented that nullstimatesnullare not cutting it, and that as prices outcome. This will increase
Salem nullomennulls Club with doughnuts donated by nullnnullnnullnullonuts
householdsnullabor costs still to be
escalate, there is nullnullercent soft money from both bridges. accurate discrepancies, help with added in). The outside meter will be
Funding Sourcenull There is no tanullimpact in nullnull. more enullitable billing, ginulle a clearer picture of the water loss, will eliminated, but someone will still hanulle to go into the home to get
The nenull article created much talnull replace antinullated enullipment, and will ginulle better sernullce through the reading renullired or installed. nullter so much talnull this article was
nullticle null nullnullater nullter Replacementnullinulld NetwornullSRF nullnullan current and more accurate information. null present water meter is nullally passed.
null,nullnullnullnull null years old, someone else will be helping to pay for the water bill. nullter much time spent on prenullous article, nullticle null nullally
null this article passes on the ballot on nullrch null the Town will begin There is much water loss in the town of Salem. arrinulled and got blown away with comments.
the process of replacing residential water meters. The current system has nullnullnullwater metersnullnull percent are at nullticle null nullnullnull nullerating nulldget nullnullnullnullnullnullnull
nullcnullroundnull The residential water meters are long onullerdue for least null years old, and null percent are null years old and older. To see if the town will nullote to raise and appropriate the sum of
replacement. This renullest is for the funding for the entire pronullct. Ninetynullne percent are nullnullinch style, which is an old design. Thirtynullhree nullllion, Three Hundred Senullentynulline Thousand, Finulle
This pronullct will help to recoup lost renullenues due to meter age. nullghtynullight percent are residential meters (nullnullnull, while null percent Hundred Fortynullinullnullllars (nullnullnullnullnullnullnull) for the operational
null the time of replacement, the feasibility of replacing them with are commercial (nullnull. nullny still hanulle outside directnullead. The enullenses of the Town for nullcal year nullnull. null this article passes, the
automated reading denullces will also allow the nullilities nullpartment adnullantages of these new meters will be loss of denulliency, not so operating budget for nullnull will be nullnullnullnullnullnullnull.
to perform monthly billing nullersus nullarterly. The meter replacement much unaccounted water, and totally new technology to replace the nullcnullroundnull This article pronulldes funding for the recurring annual
will help identify unaccounted water consumption that will also old, outdated meters. null is common practice with water meters to operating costs of pronullding a broad range of public sernullces to the
help the Town meet the nullecutinulle nullder handed down from nullS. null replace after null years, depending on enullipment standards. community. The operating budget is a nullottomnulline budgetnullby law
nulleff Hatch asnulld how long these new meters are supposed to in New Hampshire. Therefore, the nullal nullote tanulln on this article
lastnullhe reply was that they are guaranteed for null years. esnullnullnull will be based on the aggregate appropriation.
G.E.
L
Septic Systems • Sewer Hook-ups, etc.
nullote was ginullen, followed with the statement that this procedure will nullring a time when the economy is bad, this was an issue
hanulle to be done again in null years. The labor cost of meter reading that wasnnullt going onuller well at all. null was bronulln down into three
M
E
R
R
I
L
Gravel • Fill • Loam • Sand
2 Way Radios for Quick Service
will be slowly eliminated during a twonullear process. The nulldget sectionsnull nullpartment Fire Chief, Codes nullforcement, and nullolice
EXCAVATING
Committee felt this was a good monulle. nullound February null, the Records Record Clernull These were eliminated a couple of years
& Son, Inc.
Committee will nullow if the town of Salem nullalinulls for this pronullctnullif ago, and now the players are asnullng for the nullbs to be reinstated.
it doesnnullt, then this pronullct will be eliminated from the boonull. The motion to restore in tough times was not a good topic. Then,
Residential & Commercial Excavating & Grading
There were still many nullestions. null. Tilton asnulld how long it Chief nulleen had a great presentation and enulleryone felt sorry for
38 SCHOOL ST., SALEM, NH
tanulls to null the battery if a meter does not runnullnullyears to borrow the situation. nulltting bacnullfour ofnullers at close to nullnullnullnulleach a
603-898-2236
from the state and do this all onuller again. The Town nullnager came year was a dead subnullct. nullat was renullired and what was being
across with more facts to help done now to manull up for this lacnullof people did not bring smiles.
in decisionnullanullng on the The people felt that the present wornullstaff was tanullng up the slacnull
Constructive Kids Club
positinulle side. Selectman nullyons had been for a couple of years, and could nullep manullng up the
illustrated mechanics of the manpower difference. The nullbs were outlined in detail, and the
meter and stated that this was mention that the onullertime was too much and maintained with the
Summer programs for ages 3 -10
the cheapest way to get things regular nullb as well did not go onuller well. nulle were told that the
Themed Weeks
done. There will be a low duties with highest priorities were completed nullst and maybe nullst
Offered in a safe, nurturing environment, our summer programs are
interest loan from the state to reinstating an administratinulle assistant would wornullbetter to cut costs.
offered in half and full day format that is flexible to your summer help. null this article fails, nullticle erynull one felt for these people, but in these times, no one wanted to
schedule. Our themes include:
null is written and ready to go hear how hard it was on the nullb.
Celebrate the USA Exploration Station Fun in the Sun!
to do this pronullct. This meter nulleff Hatch stated that the duties hanulle been reassigned to other
Camp Nature Art, Music, Drama Club Construction
Kids in the Kitchen ...and more!
needs to get done soon. people, and maybe hire an ambulance clernullto do the billing
nullb nullliot made a statement onullerload. nullain, what was renullested was four new nullenullhters with
Literacy Academy
that if the state reneges on the their salaries and benenulls.
Perfect for children entering the 1st grade, our Literacy Academy
reimbursement and nullancing Nenull came a discussion on the three inspectors who tanull care of
provides curriculum designed to bridge the gap between the for null percent bacnull no one building, planning, and health. They coordinate across departments
academic years.
nullows for sure if they will pay to reduce incidents of unnullalinulld contractors wornullng in Salem.
Whether your child is still struggling with reading, or a confident and if more money is anullailable. nullso, increased compliance and tanullrenullenue is wornulld through this
reader who just needs to practice, our program will challenge them
nullstatement was made on enforcement. These inspectors are not nullst wornullng with building
to read, write and think creatively in a fun, playful environment.
the battery for wireless. How codes and if this is tanulln away, processing will be much slower.
Space is limited. Call or email today
long do these last, and batteries There are future permits for nullnullulas, nullwenulls, Sports nulluthority,
to reserve your child’s space.
are not nullnullpercent perfect, as and nulltimate nullectronics. nullhuge Cnull is also in the process of
Junior Lego League Ages 5 - 10
we all nullow from enullerience. denulleloping. null this is cut, enforcement drops. nullspectors monulle from
Your child will collaborate with peers and receive teacher guidance nullill alarms be sounded if this permitting, renullew planning, and inspections to resolnulle codes and
to transform the way we look at transportation. Creative thinking,
does happennull nullnthly billing issues. There will be more unnullalinulld contractors in the Salem area.
team spirit and enthusiasm required!
Learning Tree
instead of nullarterlynull nullgal problems will be more wornullto solnulle at a staff lenullel. There is
4 Cobbetts Pond Road | Windham NH 03087 | 603 965 3484 tel
Stephen Campbell sponull no assignment of code departments because there is so little time.
WindhamLearningTreeAcademy.com | info@Windham Learning Tree
Academy.com
Academy
again, saying that he would null is, the inspectors are behind in case nullesnullhere are onuller nullnullnew
linull to see if there is a nullalue renullests and innullires.
of the scrap metal from these Chief nullnonullan sponull nenull on getting bacnullan nullministratinulle
meter bases to be costnullffectinulle. nullsistant for the nullolice nullpartment. There are now onuller null fullnullime
null was again asnulld that if the ofnullers and the wornulload is out of control. This nullsistant would
funding didnnullt happen as help with appointments, bad checnull, posting information, and basic,
renullested and planned, would critical ofnulle wornullthat bogs down police detail. nullith much debate
this get scrappednull and fewer nullestions, this nullestion ended.
null more nullestions on the Stephen Campbell got up to speanulland said what many people
battery power nullpt arising, were feeling. There are too many good ideas, and they all sound
nullnullide said he would nulld great, but if they pass, the tanulls will denullitely go up. null a time when
things are tough, and we hanulle
been so long without these
items, we can really get along a
little longer without.
The nullputy Fire Chief has
been nullacant for null months, the
clernullhas been gone for a while,
and code enforcements hanulle
been down null percent. There is
nullnullpercent unemployment now
in Salemnullthese items will come
up to at least a nullnullercent tanull
increase, and how many people
hanulle gotten raises this year to
counteract thisnull nullnnullt pass on
the nullancial problems to the
It’s your turn to choose.
tanullayers. These items, for now,
are not sound economics for the
state of Salemnulls economy. The
town needs to cut, and they can
if they nullst stop nullantingnullthis
nullhen null comes to choosnullnulla checnullnullnullaccount, you hanulle many chonulles.
is a start to turn Salem around.
nullt Salem nullonullonullratnulle Bannull, we’d lnulle to nullenullnull that way. Here, you’ll ennully the
nullnullote was tanulln, and after
it was hard to determine,
enulleryday nullnenulls onulla communnully nullnnulllnulle nullrsonalnulled sernullce, nullreater
another one was done standing.
nullnulllnullnull y, nullus a whole lot more.
There were only null people in
attendance and the nullote passed
nullor a lnullnulled tnulle, when you onulln the checnullnullnullaccount onullyour chonulle, you WE’LL BE THERE FIRST
...
by null.
The nullal topic was
also nullt to choose a nullntastnull nullnullt nullom our amanullnnullassortmentnull
GUARANTEED!
eliminating the pay for the
Selectmen. nulls. nullrry stood
up and defended the fact that
with all the wornullinnullolnulled, their
pay was hardly enough. nullst
T
E
R
B
U
S
T
E
R
!
of the Selectmen were happy
W
I
N
N
e
x
t
P
ro
je
c
t
doing this nullb nullolunteering,
w
it
h
Y
o
u
r
T
im
e
which is common practice.
Y
o
u
r
T
a
k
e
. nullnullide and nulls. Roth null
stated that whatenuller they
hanulle receinulled has gone bacnull
to the town in some way. null
up
.
was thought, though, that if
ati
c p
ick
n
ly.
Au
tom
this were eliminated for future
d o
rde
rs
o
3 South Broadway | Salem, NH 03079 | (603) null3null333 | nullanull(603) nullnullnull60 |
www.salemcoonull.com
e-p
ai
ay
s.
e o
nly
. P
r
d t
im
r r
en
tal
d
people running for this ofnulle,
r a
lim
ite ight
an
d o
Dumpster Rentals Starting at $295
ail
ab
le
fo ss
w
e
ex
ce
s o
nly
. A
v
ap
ply
fo
r
w
ill
it would be hard to get the pay
nullnullnnullmum nullnullnull0 new enullternal nullunds denullosnullt and chonullce onull dnullrect denullosnullt or nullnullH renullunullred to recenullnulle nullnullnullt. nullust also choose one addnulltnullonal
arg
es
em
po
rar
y r
en
tal
Va
lid
on
t
Ad
dit
ion
al
ch
scale bacnull nullter much debate
sernullnullcenull nullnlnullne Bannullnullnnull, Bnullll nullay or nullenullnullt nullard. nullromotnullon runs nullrom nullanuary nullnull, null0null0 throunullh nullarch 3null, null0null0. Salem nullonullonulleratnullnulle Bannull
bacnulland forth, it was passed.
resernulles the rnullnullht to enullchannulle nulltems onull enullual nullalue nullased on anullanulllanullnulllnullty. nullnuller may nulle wnullthdrawn at any tnullme. nullnullnullt nulltems may nulle tanullanullle.
The meeting nullally ended
Log On To
DumpsterDepot.com
Toll Free with all articles passing for now.
1-866-99-DEPOT
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14