Armac Group Turn Key Package
The Armac Group provides every service required to transform a derelict site to
a cleared, safe, clean site ready for development or re-use. We call it our ‘turn
key package’.
By consulting us at the early stage for technical expertise, cost-effective,
environmentally sensitive solutions to a project, clients are able to save time,
effort and money.
Our turn key package broadly encompasses the following key stages:
• Asbestos Survey & Removal Beginning with the asbestos survey
our surveyors will prepare an accurate Type 3 survey. Our in-house, licensed,
asbestos operatives will then tackle the most difficult asbestos removal works.
We can de-risk this process for the client by providing a lump sum, all risk
removal cost if we are working from our own survey. We also provide an easier
interface with any demolition activities when working alongside our own
demolition crews allowing for accelerated programme times.
• Demolition From the initial design of the demolition process with 2D &
3D Cad modeling, our highly trained staff and specialist fleet of state of the art
demolition plant, allows us to quickly and safely clear any site. We will also
deal with all other planning and design issues such as service disconnections,
temporary works and statutory notifications. Our commitment to sustainability
provides cost saving solutions and allows us to consistently seek new methods
to usefully process and re-use demolition derived materials.
• Remediation Our in-house experts have a wealth of remediation experience
and a track record of addressing the most technically demanding issues in a robust
and cost effective manner. We can also intergrate any geotechnical requirements
and related groundwork packages such as piling and earthworks. Our technical
team will provide detailed completion reports for the regulators and collateral
warranties for the site funders to demonstrate that the site has been remediated
to the required standards.
Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100