VENUEVENUE
UK
Academy3
output busses and selective loading of show configurations. The exterior of O2 Academy Birmingham has two Studio Due
The new software resides within the context of a thoroughly CS-4 Moving Par Can fixtures for a unique exterior effect, while
well thought out desk. “Everyone is talking about how good the a Robe DT3000 digital moving head projector allows images
sound is and a lot of engineers are now touring with it,” continues and video to be projected across the outside of the venue and
Jackson. “It makes life easier because it’s one less piece of kit pavement.
[touring productions] have to bring in.” The main video fixtures inside are the two DT5000 moving head
The Digidesign Profile Mixracks have become an industry standard projectors that are connected to Dimension’s installation of a
and offer flexibility for recording. Both of them have the Firewire Hippotizer Critter media server. This sends visual content to any
Interfaces that allow them to link up directly with ProTools LE of the 21 screens in the venue, with multiple feeds capable of
which will provide multitrack recording facilities for artists. sending different images to each screen. This is all carried out via
The multicore systems are wired identically in all three rooms to Kramer distribution. All three venues have screens at the back of
allow any of the desks to go into any of the different areas without the stage, and the option for artists to provide their own visual
the need to strip out looms and patch cables, thereby providing content.
flexibility for visiting engineers. Utopium’s Installation Manager, Angus Chinn, who specified all
All ‘grab EQ’s’ in the three rooms are via BSS 960’s or 966’s and the intelligent lighting, projectors and LED mood-lighting fixtures
these are provided as an additional bonus. Shure, Sennheiser and explained the necessity of robust and well-respected kit: “I look
AKG make up the majority of the 96 microphones on site with 20 for fixtures that can cope with being moved. It’s not just like a
DI boxes from BSS. club install where fixtures go up and they stay in the same place,
With no corner left untouched, Pulsar Chroma range LEDs are these guys are taking the stuff down and moving it around several
set into stairways, ceilings and walls. This includes Chroma Panels, times a week, so it’s got to have a degree of durability. I might
spheres, cubes and strips. Anolis LED lighting products are used be speaking out of line, some manufacturers won’t like this, but I
for illuminating the bars around the venue and up-lighting pillars bought some fixtures that look and work fantastically for installs
and walls. but just don’t stand up going on and off truck, being pulled
056 January / February 2010
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116