Left A variety of shows - including a diving shows
- entertain visitors throughout the day, each requiring
its own lighting effect program
Ushio lamp necessary to allow the animals
to thrive.
“The conceptual requirements developed by
the client specified the need for environ-
mental lighting which would simulate the
cycles of daylighting including dusk and
night,” Ferreira notes. “The scrollers were
specified to manage these soft transitions,
as they permit the use of fittings and lamps
developed to support aquatic life. No LED or
automated lighting fixture would ever have
met our specific criteria in terms of ease of
maintenance, targeted illuminance and high
CRI values.”
Luke Delwiche of ETC London programmed
the Pharos LPC system that creates the
environmental transitions. “A lot of the
project was a lot more theatrical than it
was architectural, in many ways,” Delwiche
says. ETC and UAE-based Oasis Enterprises
provided the complete control system con-
sisting of Sensor CE racks for the dimming
and switching of the luminaires, DMX distri-
bution to the Wybron system and interface
with a Pharos LPC controller.
Pic: Hassan Mahmoud Bushnaq Sequencing the colours proved to be more
than a little tricky – the scrollers couldn’t
all move to the same colour at once, as the
entire tank could be plunged into dark-
ness or the combinations of colours would
appear unnatural. CD+M pre-arranged the
scroll palettes in three different sequences
of colours in order to allow the program-
ming of a complicated series of cross fades
using HID lamps that can not fade out or
turn off during normal operating hours.
And of course, the animals need to rest, so
when the facility closes for the evening, the
control system switches on a series of Thorn
Lighting marine-grade fluorescent fixtures
sleeved in Rosco R80 to simulate moonlight.
Work lighting above the maintenance plat-
form is also connected to the Pharos control
Pic: Daniel Cheong system.
Höhe, mehr als 10Millionen Litern Wasser und eine Reihe von fluoreszierenden Thorn Lighting Be- ha inoltreprogrammato il sistema LPC Pharos CD+M Lighting Design comenzóeldiseño en
33.000Tieren,diemehrals85Artenrepräsentieren, festigungen in Marinequalität an, die in Rosco R80 per la creazione delle transizioni ambientali. La 2006. La iluminación básica se logra con reflec-
einschließlich Haien und Stachelrochen. CD+M gehüllt sind, um Mondlicht zusimulieren. CD+M ha predisposto le placche di scorrimento tores Hydrel de alurometálico cada uno comple-
Lighting Design begann 2006mit dem Design. in trediverse sequenzedicolore; questo permette mentado con desplazadores Wybron. Hydrel junto
Die Primärbeleuchtung ist mit modifizierten Hydrel la programmazione di una serie complessa di sfu- con CD+M hizoundiseño personalizado de unITALIANO
Metallhalogenid-Flutlichtern erreicht worden, die maturedicolore, le quali si incrociano enon pos- reflector,una horquilla yun enchufe de extensión
jeweils mit Wybron Scrollern versehen sind. Hydrel L’ Acquario di Dubai rappresenta uno dei piùgrandi sono dissolversi ospegnersi durante le normali ore para acomodar la lámpara especificada 10,000
hat einen Reflektor,Yoke und einen Lampenfas- acquari al coperto alivello mondiale. Con una di operatività. Durante la sera, inoltre, quando gli Kelvin Ushio de 400 vatios para que los animales
sungsanbau kundenspezifisch mit CD+M entwor- grandezzadi51m di larghezzax20mdiprofondità animali necessitano di riposo elastruttura chiude, prosperaran. ETC London programó el sistema
fen, um die spezifizierte 400-Watt, 10.000 Kelvin x11m di altezza, esso contiene al suo interno più il sistema di controllo fa accendereuna serie di Pharos LPC que crea las transiciones ambientales.
Ushio Lampe aufzunehmen, die fürdas Gedeihen di 10milioni di litri d’acqua e33,000 animali, rap- luci fluorescenti con sfumatura marina della Thorn CD+M arregló previamente las paletas de los
der Tierenotwendig ist. ETC London hat das Pharos presentando piùdi 85 specie inclusi gli squali e Lighting, con aggiunta del Rosco R80per simulare desplazadores en tres secuencias diferentes de
LPC System programmiert, das die ökologischen le razze. La CD+M Lighting Design ha avviato il la luce lunare. colores afindepoder programar una complicada
Übergänge erzeugt. CD+M hat die Scroll Paletten progetto di illuminazione nel 2006. L’ illuminazione serie de tonos usando lámparas de alta definición
in drei verschiedenen Farbabfolgen vorgeregelt, principale ècostituita da riflettori modificati Hydrel que no pueden perder su intensidad oapagarseESPAÑOL
um die Programmierung einer komplizierten Reihe ad alogenuri metallici, ognuno dei quali èacces- durante las horas normales de funcionamiento.
von Überblendungen zuermöglichen. Verwen- soriato con scroller Wybron. Hydrel ha proget- El acuario de Dubái es uno de los acuarios interi- Como los animales necesitan descansar,cuando
det wurden dafürHID Lampen, die während der tato un riflettore, un giogo eun’estensione di presa ores más grande del mundo al medir 51 metros de el lugar cierra sus puertas en la noche, el sistema
normalen Betriebszeiten nicht ausgeblendet oder personalizzati insieme alla CD+M, allo scopo ancho, por 20metros de profundidad y11 metros de control enciende una serie de luces aguamarina
ausgeschaltet werden können. Und selbstverstän- di accoglierelaspecifica lampada Ushio da 400 de alto yal tener más de 10millones de litros de fluorescente, envueltas en unidades Rosco R80
dlich brauchen die TiereRuhe. Deswegen stellt das watt e10,000 Kelvin, necessaria per garantireun agua y33.000 animales que representan más de para simular la luzde la luna.
Kontrollsystem abends, wenn die Anlage schließt, ambiente prosperoper gli animali. La ETC London 85 especies, incluyendo tiburones yrayas.
Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140
Produced with Yudu - www.yudu.com