This page contains a Flash digital edition of a book.
The GTA Construction Report – June 2009 – PAGE B11
T.R. Hinan
The client is the number one priority at
T.R. Hinan, Terry says, and the motivation
Continued from page B10
behind many of the policies that the com-
––––––––––––––––––––––––––––––––––
pany has in place. Stringent training and
T.R. Hinan’s scope of work reaches all
safety procedures ensure that the client can
across the southern part of the province.
expect a well-managed timetable with min-
From the Niagara Peninsula to Hamilton,
imal adjustments throughout the project. It
and from Guelph to Kitchener to Waterloo
also ensures that the individuals working
and Peterborough. “We’ve even worked on
on the project are dedicated to timely and
the casino in Gananoque,” Terry says. “We
successful completion. “This keeps us
cover a pretty wide area.”
abreast of all the latest advances in the con-
A major development for the company
struction industry so that it remains well in-
is the new Niagara Peninsula Energy Inc.
formed and able to provide clients with
Service Centre in the Town of Smithville,
progressive solutions.”
Ontario.
T.R. Hinan offers clients competitive so-
The centrally located state-of-the-art
lutions to their construction needs in all
service centre, which opens this summer, is
areas and forms of construction. The indi-
designed to promptly and efficiently serve
viduals behind the T.R. Hinan name have
the residents of West Niagara.
today and this centre will be completely While T.R. Hinan has a full plate with been trained to operate as a team and to
The centre will occupy 24,700 square
self-sustaining through the use of on-site massive undertakings such as the Niagara work in tandem with other professionals
feet that will have approximately 7,500
emergency generation. Peninsula project, they are not one to rest and the client. “Therefore,” he says, “the
square feet of office space, an inventory
on their laurels. design build and project management sce-
storage facility of 5,200 square feet and
The Niagara Peninsula Energy site will “We now do mostly construction man- nario make the most effective use of their
truck storage space of 12,000 square feet.
provide a central location for customers, agement work. That’s our bread and butter. skills.”
Designed with LEED considerations, this
both residential and businesses with easily We also do some municipal work – banks, The T.R. Hinan team will design a func-
facility includes a number of energy effi-
accessible services. churches, things like that. We also do insti- tional and cost-effective construction proj-
cient features, including:
The Niagara Peninsula Energy Inc.’s tutional, commercial, and a little design ect and then act as team players throughout
Lighting technology using T5 fluores-
mission is to deliver safe, efficient and re- build too.” the construction management phase. The
cent lights c/w occupancy sensors;
liable electricity in an environmentally sus- However, Terry says his company is client then gains the benefit of having an
Building envelope designed to include
tainable and technologically focused looking to move into yet another area of experienced and dedicated team looking
insulation in the wall cavity and the roof,
manner. Niagara Peninsula Energy Inc. construction. “We’re starting to get into the out for their best interest throughout all
even in the garage area, windows are insu-
provides electricity distribution and related residential market,” he says, matter-of- phases of the construction while coordinat-
lated double glazed units with Low E coat-
services to approximately 55,000 residen- factly. “We’re starting to do some develop- ing the other players to ensure a timely and
ing to reflect solar heat but permit light;
tial and business customers in the City of ment work in that area. It’s currently in the cost-effective conclusion to the project.
High performance mechanical systems
Niagara Falls, the town of Lincoln, the first phase of a residential sub-division.” Not only do they do their best for their
for HVAC are using the highest level of En-
town of Pelham and township of West Lin- No matter what area they delve into, the
––––––––––––––––––––––––––––––––––
ergy Star rating products on the market
coln. focus of T.R. Hinan remains the same.
Continued on page B12
Congratulations to
Congratulations to T. R. Hinan Contractors Inc
T. R. Hinan Contractors Inc.
W
Glass & Entrances Inc.
ELLAND
Art Woodwork
RESIDENTIAL COMMERCIAL
80 Commerce Place, St. Catharines, ON L2R 6P7
Tel: 905-684-4333 Fax: 905-684-8640
• Framed Mirrors • Glass Tabletops & Shelves
www.artwoodwork.com
• Sealed Insulated Units • Aluminum Storefronts
• Frameless Glass Showers • Beveled Mirrors
• Tempered Glass
Quality Workmanship doesn’t happen by chance.
• Architectural Patterened Glass
It requires skill, pride and attention to detail.
905-734-9228
www.wellandglass.com
59 Southworth St. N
This is Art Woodwork
Congratulations to T. R. Hinan Contractors Inc.
We are proud to be working with your team
Niagara’s Complete Concrete Contractor
Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24
Produced with Yudu - www.yudu.com