20-21 SDN Cryoservice:Layout 1 15/5/09 16:31 Page 2
STADIUM DEVELOPMENT NEWS
our bars,” he continued.
As a supplier of specialist gases not only to
leisure businesses, CryoService also provides
world class gas supply solutions to science
and industry too. Established in 1970, the
Company has embraced innovation and new
technology and quickly developed a
reputation as the supplier of choice for critical
applications, pioneering a unique delivery
service and developing innovative storage
solutions than provide tangible benefits to its
customers.
Sheffield United isn’t the only stadium to
have recognised the benefits of the
CryoService gas solutions. When The O2
Arena opened in July 2007 it instantly became
one of the world’s most popular music
venue’s, with leading bands taking to the
stage and was regularly filling its 23,000
capacity. Like Sheffield United it looked to
CryoService to deliver a bespoke drinks
dispense and soft drinks gas system that was
able to meet the massive peaks in trade.
Big venues like The O2 Arena know that
putting the best bands on is only half the job
in making a venue profitable. The food and
drinks operation is critical in delivering a
positive visitor experience as well as a
financially successful venue. To meet the
drink demand, The O2 Arena had already
decided to install a fast pour system
throughout the venues’ bars.
The ability to meet these requirements was
fundamentally down to the unique approach
taken by CryoService. Rather than attempting
to install standard storage vessels,
CryoService took a bottom up approach,
reviewing the whole site layout and
requirements and designing a customized
system that would deliver against the needs
of the O2 Arena. The result was an externally
sited 3,000 litre storage vessel linked to a site
specific pipework system capable of
delivering drinks dispense and soft drinks to
the entire O2 Arena site.
Lee Roberts, Commercial Director of The
O2 Arena commented, “We were impressed
with CryoService’s approach to our
requirements and their willingness to develop
and design a system that met the demands of
BENEFITS OF THE CARBOSTORE SYSTEM
our site. We now enjoy the benefits of a
Saves Time - no more cylinder handling or changing – especially during busy sessions
system that can cope with our peak demands Saves Money - only pay for the CO2 you use cylinders are often changed at the start of a
whilst ensuring the safety of our visitors and shift and returned with 15-20% product remaining. CarboStore is permanently connected
staff”.
and refilled on site; you pay only the for product you use.
Aside from SUFC and The O2 Arena,
Saves Space - tank can be sited conveniently outside to relieve valuable cellar / plant room
CryoService has an impressive list of big
space
name clients across its leisure division
Saves Administration - charging structure tailored to suit, means billing and budgeting is
including McDonald’s Restaurants, Young’s
clear
pubs, Odeon Cinemas, Wembley Stadium and
Bannatyne’s Health Clubs, for whom it
Saves Saleable Product - constant pressure levels means fobbing can be significantly
provides a tailored swimming pool CO2
reduced. pH fluctuation reduced in swimming pool applications
supply solution across its 60 UK locations.
Safety Built In - no more handling cylinders means less chance of injury to you and your
With each customer receiving a bespoke staff. CO2 monitors and other safety equipment are supplied as standard.
system tailored to the needs their venues and Consistent Quality - Constant pressure and flow for consistent drinks dispense.
requirements, CryoService has built an
Remote fill capability - your staff don’t have to stop serving customers to accept
enviable reputation for quality, product
deliveries.
reliability and excellent service.
FSA
Fit and Forget System - the system is designed to need virtually no input from you or your
staff.
CryoService
Peace of Mind - our Gas Management system automatically schedules regular deliveries,
Tel: 01905 758200
saving you the hassle of chasing orders or waiting for deliveries.
www.cryoservice.co.uk
May/June 2009 | FOOTBALL & SPORTS ARENA | 21
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48