Conceptual/Planning Stage
Sno Organisation Project Title / Details Location Budget* Contacts Sector
26 APGenco Plans to establish a 2x1000 mw nuclear Andhra 15000.00 Vidyutsoudha, Khairatabad, Hyder- Nuclear
power plant in Andhra Pradesh. The Pradesh abad-500082, Andhra Pradesh. Energy
plant will be setup either in Kadapa or T: 040-23499000 / 39839000,
Srikakulam Districts. Joint venture agree- F: 23499101, M: 094409071191
ment with NPCIL will be signed shortly in
this regard. The completion is expected
in three years from start date.
27 Larsen & India’s leading epc player has signed NA .. D Chatterjee, Head - Media Relations, Nuclear
Toubro an MOU with Atomic Energy of Canada Bakhtawar, Ground Floor, Nariman Energy
(L&T) Limited (AECL) for setting up Canada’s Point, Mumbai - 400021.
ACR 1000 nuclear reactors in India and T: 022-66585144 / 5100, F: 66585146,
exploring global opportunities in the fi eld of
dc-ccd@lth.ltindia.com
nuclear power. India is targetting nuclear
power capacity of about 63,000 MW by
2032. This provides immense opportunities
in the Nuclear power generation sector.
28 Larsen & India’s leading epc player has signed MOU NA .. D Chatterjee, Head - Media Relations, Nuclear
Toubro with US-based Westinghouse Electric Com- Bakhtawar, Ground Floor, Nariman Energy
(L&T) pany (WEC). This tie-up will enable L&T and Point, Mumbai - 400021.
WEC to utilise indigenous capabilities for the T: 022-66585144 / 5100, F: 66585146,
turnkey construction of nuclear power plants
dc-ccd@lth.ltindia.com
including supply of reactor equipment and
systems, valves, electrical & instrumentation
products and fabrication of structural, piping
and equipment modules for the Westing-
house AP 1000 plants.
29 Oil & The company board has approved the sec- Mumbai 7133.39 S K Gupta, GM ( Production), Ali Yavar Oil & Gas
Natural Gas ond phase of Mumbai High North (MHN) Maharashtra Jung Marg, Bandra (East), Mumbai-
Corporation Redevelopment project, which will yield an 4000851. T: 022-26562823, 26599806,
Ltd (ONGC) incremental crude oil production of 17.354 2) Sunil Arora, DGM, Tower-2 Jeevan
million metric tonnes (mmt) and natural gas Bharati 8th Floor, 124 Indira Chowk-
2.987 billion cubic metres (bcm), aggregat- New Delhi-110001.T: 011-23314599,
ing to 20.34 million tonnes of oil equivalent, 23323201, F: 23316413.
by March 2030. The project is scheduled to ( R S Sharma, CMD)
be completed by September 2012.
30 Aksh India’s largest manufacturer and sup- Kandla 16.00 Priyanka Singh, Head - Branding & Optical Fibre
Optifi bre Ltd plier of optic fi bre cables plans to set Gujarat Communications, J-1/1, B-1 Extension, Cables
(AKSH) up a greenfi eld facility at Kandla SEZ Mohan Co-operative Industrial Estate,
for manufacturing glass fi ber reinforced Mathura Road, New Delhi -110044.
plastic (FRP) rods in Gujarat. FRP rods T: 011-26991508/09, F: 26991510,
are used optic fi bre cables. The plant will
priyanka@airmail.co.in,
be set up in two phases. www.akshoptifi
bre.com
31 Dhunseri South Asian Petrochem Ltd (SAPL) Haldia 2500.00 B Chattopadhyay, Director, Dhunseri Polycarbonate
Polycarbonate subsidiary plans to set up 1,30,000 tpa West Bengal House, 4 A, Woodburn Park, Kol-
polycarbonate mega project in Haldia. kata-700020, West Bengal, T: 033-
The project completion is expected in 22806972, 22836128-33, F: 22801956,
three years time. The company is looking
bchat@aspetindia.com (P K Kaitan,
for private equity funding in this regard. Chairman)
The company is in possession of 98 acre
of land for this project.
32 Mundra Port The company has signed an MOU with Mundra 15000.00 Dipankar Chatterjee, Post Box No. 1, Port
and Special the Gujarat Government for the expan- Gujarat Navinal Island, Mundra (Kutch), Gujarat
Economic sion and development of following facili- - 370421. T: 02838-289248/448,
Zone Ltd ties in Gujarat. 1) Development of a State F: 289200/440,
mktg@mundraport.com
of the art Modern Coal handling terminal
capable of handling capesize vessels
at Vandhi, Mundra. 2) Development of
container and ro ro terminal in Bocha
island, Mundra. 3) Development of south
port with container and ro ro terminal, dry
and bulk cargo berths and liquid cargo
berths at Mundra Port. The commercial
operation of the proposed port facilities in
a phased manner is expected by 2011.
*Figures are approximate (Rs. Crore)
Project Reporter • 5 • March 1, 2009
Project Reporter.indd 5 26/02/2009 12:14:34 PM
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24