Sno Organisation Project Title / Details Location Budget* Contacts Sector
50 Kilburn The company has bagged an order from Gujarat 11.10 AD Kolgoankar, Vice President, Calciner
Engineering Tata Chemical Ltd, Mithapur, Gujarat for Subhash Nagar, Bhandup (W),
Ltd supply of Calciner. Mumbai- 400078, T-022-25663101-10,
F: 25668436,
www.kilburnengg.com
51 Karnataka The board has awarded the contract to Karnataka 53.86 N Prasanna Murthy, Executive Engi- Canal/Dam/
Urban IVRCL Infrastructure and Project Ltd for con- neer, #6, Jalabhavan, 1st Stage, 1st Irrigation
Water struction of head works near Almatti dam, Phase, BTM Layout, Bannerghatta
Supply and laying and joining pipes from the head works Road, Bangalore - 560029.
Drainage up to water treatment plant at Hungund T: 08352-253641, 080- 41106504,
Board and construction of two pump houses. The F: 26539206.
project will be completed in 20 months.
52 Ahluwalia The company bagged the contract for re- Hyderabad 87.08 Arun Sahai, CEO, Ahluwalia House, Construction
Contracts tail development in Arena Town Centre at Andhra 4 Community Centre, Saket, New
India Ltd Uppal, Hyderabad by Topnotch Projects Pradesh Delhi-110017, Delhi. T: 011- 40504500,
Pvt Ltd. 26562676, 41664016, 40504509,
F: 26852036. M: 09810050584,
(Bikramjit Ahluwalia, CMD)
53 Educomp The company has received work order from Uttar .. Somya Kanti, President, 514, Udyog Education
Solutions Education Director (Secondary), Lucknow Pradesh Vihar, Phase III, Gurgaon-122001,
Ltd for implementation of computer education Haryana. T: 0124-4529000, F: 4529039.
and computer aided education in 1401 ( Shantanu Prakash, CEO & MD)
schools in 4 zones namely, Lucknow (372
schools), Meerut (380 schools), Jhansi (369
schools), Gorakhpur (280 schools) for the
period of 5 years on BOOT basis.
54 Ram The company has received an order from Karnataka .. Siddhulinga Swamy, BDO, # 70, 1st e-Governance
Informatics Karnataka Electronics Development Cor- Floor, Venkatachala Complex, Subbam-
Ltd poration Ltd (KEONICS) for Study, Analy- ma Chetty Road, Netkallappa Circle,
sis, Design and Development of Reports Basavanagudi, Bangalore-560004.
for Nemmadi Project, an egovernance T: 080-26620760/61, 32958442, M:
intiative from Karnataka Government. 09886139194,
swamy@raminfo.com
55 Petron Petron Mechanical Industries (a division Jharsuguda 9.78 J Mathew,DGM, Swastik Chambers, Engineering
Engineering of the Company) has received a Letter Orissa 6th Floor, Sion Trombay Road,
Construc- of Intent from Vedanta Aluminium Ltd Chembur, Mumbai-400071,
tion Ltd for design, engineering, manufacturing, Maharashtra. T: 022- 67973501-06,
erection, commissioning etc. of 57 Nos. F: 67973509, 67973510.
of Cranes & Hoists for their Expansion
pmijo@petronengineering.com
Aluminium Smelter Plant at Jharsuguda. (Thankappan Sadasiva Das, MD)
The work will start after 3 months and
complete in 10 months.
56 Welspun The company has got order from GAIL NA 500.00 Jiji Cherian, Marketing Manager, Welspun Pipes
Gujarat for the supply of LSAW pipes. House, 5th Flr, Kamala Mills Compound,
Stahl Senapati Bapat Marg, Lower Parel,
Rohren Ltd Mumbai-400013. T: 022-66136000,
F: 24908020,
jiji_cherian@welspun.com
57 Indian Oil The contract for civil, structural and as- Guwahati 38.32 Suniti Kumar Patra, DGM - Projects, Piping
Corporation sociated underground piping works of MS Assam Guwhati Refi nery, IOCL, Noonmati, Works
Ltd Quality Upgradation Project at Guwahati Guwhati, Assam - 781020.
Refi nery is awarded to IVRCL Infrastruc- T: 0361-2657209, 2597116.
ture and Projects Ltd. The work has
already started recently and the project is
expected to complete in 15 months.
58 Petron The company has received an order from Krishna 8.72 Swastik Chambers, 6th Floor, Sion Power
Engineering Lanco Infratech Ltd., for complete pack- District Trombay Road, Chembur, Mum-
Construction age of Electrical Erection for their 366 Andhra bai-400071, Maharashtra.T: 022-
Ltd MW Combined Cycle Power Plant- Stage Pradesh 67973501-06, F: 67973509, 67973510.
II at Kondapalliida, District Krishna, A.P. (Thankappan Sadasiva Das, MD)
59 Hindustan The HCC-Halcrow Consortium has Baramulla 2726.49 Sandeep Sawant, DGM - Media Rela- Power
Construction bagged the EPC contract for 330 MW district tions, LBS Marg, Vikhroli (W), Mumbai
Company Kishanganga hydro-electric project Jammu & 400083. T: 022- 25775959,
Ltd located on river Kishanganga from NTPC Kashmir F: 25777568, M: 9833992874,
on turnkey basis. The project involves
sandeep.sawant@hccindia.com
the construction of a 37m high concrete (Ajit Gulabchand, CMD)
faced rockfi ll dam, 23.5 km of head race
tunnel and an underground powerhouse.
*Figures are approximate (Rs. Crore)
page 13
handptrtsld
Project Reporter • 8 • March 1, 2009
Project Reporter.indd 8 26/02/2009 12:14:34 PM
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24