Out and About Abacus Lighting Ltd Reading Train Depot Reading, UK


6


A‘light’ here


Reading Train Depot now has all new state-of-the-art lighting. As part of a £36m rebuild of this critical support hub which keeps the train services running in the South and London and has done for over 50 years required the update. Abacus provided a full site solution.


Abacus have a positive history and track


record of successful projects and produced a full site solution for their latest project which Berkshire residents had concerns with. Overhead gantries and the light level was a prominent factor and required a lot of thought and a highly effective solution. They made arrangements to combat tricky terrain that lay ahead, as Volker Fitzpatrick Project Manager Nick Langdon stated, “Abacus were involved in the project from early design stage due to the strict planning requirements imposed due to the elevated position of the depot. The lighting installation with Abacus supplied components included: 670 LED bollards, 70 6m raise and lower lighting columns and 110 wall mount bulkheads.” As Abacus were involved so early on in the project, they were able to design and tailor the ideal solution for this project as Abacus’ Darren Pearce commented, “We worked over a two year period to assist in the early design stages to achieve the National Rail specification for both average, minimum uniformity levels and low glare for drivers along with a green solution that showed


great life cost savings.” The implementation of this Quartz LED bollard with specifically designed optics has allowed the bollard spacing to be increased which means less bollards and a higher level of manoeuvrability for the staff without the loss of any light and less CO2 output. Volker Fitzpatrick from the Dynamic engineering and construction company, led the project for Network Rail which started work in November 2011 and completed in late July 2013. The old depot is now retired and due to be demolished. This project was no small accomplishment as Nick Langdon continued “The Reading Train Care Depot project as part of Crossrail Reading works has been completed on time and within budget. Involving the installation of over 4.5km of sidings, 2km of Overhead line, a 220m road maintenance shed, an under-frame cleaning facility, a 70m bidirectional train wash facility and multiple ancillary buildings.”


Contact


Abacus Lighting Limited +44 (0)1623 511111 www.abacuslighting.com


52 www.a1lightingmagazine.com


A1


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84