SPORTS FLOORING


ALL THE FLOOR'S A STAGE


The UK’s leading manufacturer of subfloor preparation products and flooring adhesives, F. Ball and Co. Ltd., took centre stage at the London 2012 Games last year, thanks to its sprayable adhesive solution, Styccobond S930.


F. Ball and Co. Ltd and their high performance adhesive, Styccobond S930, proved to be the ideal solution for Tufts Flooring Ltd at last year's Olympics. Tufts installed the 8,000m2 vinyl floorcovering depicting the River Thames snaking through London’s East End, which was the final floor display for the London 2012 opening ceremony last July.


The decorative floorcovering was printed and produced by specialist performance floor company, Le Mark Group, and is the largest ever printed stage floor in the world. Specifically designed to withstand the heavy


volumes of traffic, rehearsals and equipment over a six-week period, as well as being aesthetically perfect for the high profile event, the flooring was installed outside, in the wettest June on record for over 100 years.


“Not one join or section of the vinyl lifted, despite all the heavy rain, standing puddles of water and rehearsals.”


Styccobond S930 helped overcome time constraints with its high bond strength and impressive 10m2


/l


coverage capabilities. Furthermore, with its protein-free, low odour formulation, the adhesive also met all of LOCOG’s environmental requirements for the temporary installation of the vinyl cover on the wooden sub-stage.


Dean Tanner, Director of Tufts Flooring, was delighted with the project. He said: “Being a part of the London 2012 Games was a unique, albeit pressured, opportunity. Only the best result would be acceptable, and the product


30


selection was a huge part of this. When I approached F. Ball, they could not have been more helpful and invited me to attend a specialist demostration day at their training facility in Staffordshire. This helped us get to grips with the sprayable Styccobond system.


“The end result was flawless; the vinyl sheet looked perfect from start to finish, and not one join or section of the vinyl lifted, despite all the heavy rain, standing puddles of water and rehearsals before the opening ceremony.”


Project Manager for Le Mark Group, Dave Cartwright, commented: “The speed in which the spray adhesive could be applied and dry was crucial to the success of the installation. Limited by installation time schedules and the terrible weather, we were glad that the Styccobond S930 didn’t let us down.”


www.f-ball.co.uk


www.tomorrowsflooring.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74