A fast turnaround from Martin Engineering helped Izmir Cimentas Plant meet its tight outage schedule
A
leading Turkish cement producer has specifi ed high- performance air cannons to replace an under-performing
existing system, which was jeopardizing the plant’s output capacity by failing to remove accumulated material from the preheaters. The new air cannon network resolves build-up issues that previously needed manual removal on a daily basis, which required at least two hours’ maintenance each time, as well as a monthly slowdown for a major cleaning. To supply the cement industry in Turkey and other countries, the Izmir Cimentas plant manufactures 5,550 tonnes per day of clinker from two production lines. Lo- cated in Izmir’s city centre, the facility is one of the four cement plants belonging to Cementir Holding, acquired in 2001. Cimentas is the fi rst foreign-owned Turkish cement producer, and has a total annual production capacity of 5.4 million tonnes. Since 2001 Cementir has invested more than $530 million USD to expand capac- ity and increase effi ciency, consolidating and enhancing its presence in Turkey.
The positive action of the Tornado valve delivers faster discharge, amplifying output force by as much as 20% over standard air cannon designs.
The new air cannon network resolves build-up issues that previously needed manual removal on a daily basis, requiring at least two hours’ daily maintenance and a monthly slowdown for a major cleaning.
38 June 2012 Solids and Bulk Handling
To address the material build-up issue, the plant decided to have a detailed survey performed by Martin Engineering technicians, who inspected the preheaters and planned out a solution that included upgrading all air cannons on the entire preheater tower of the 3rd line with Martin Engineering air cannons. On 15 January, 2010, a purchase order was received from Cimentas headquarters of Turkey, with a tentative installation date in mid-March. However, just three days later, offi cials from the plant called Martin Engineer- ing Turkey’s offi ce in Istanbul, explain- ing that the facility now hoped to use an outage of just ten days to install the air cannons, starting immediately. Martin Engineering Turkey placed a rush on the order, delivering 50 high temperature nozzles, 50 air cannons and a variety of pneumatic components and control systems to the plant within a few working days. On the second day of the shutdown, Martin Engineering Service technicians arrived at the plant to begin the upgrade, working through the night until the changes were complete, supervising the installation and helping to program the fi ring sequences. The Big Blaster Air Cannons with Tornado Exhaust valves fi re a powerful discharge of compressed air to remove material ad- hered to the vessel walls. Introduced by Martin Engineering in 1974, the technol- ogy has since developed a proven track record around the world for relieving bottlenecks caused by material buildup in high-capacity storage and process vessels. The air cannon combines a fast-acting, high-fl ow valve with a pressure vessel (tank). It performs work when compressed air (or some other inert gas) in the tank is suddenly released by the valve and directed through a nozzle, which is strategically positioned
www.solidsandbulk.co.uk
in the tower, duct, cyclone or other location. Often installed in a series and precisely sequenced for maximum effect, the network can be timed to best suit individual process conditions or material characteristics. The timed discharge breaks down mate- rial accumulations and opens blocked pathways, allowing solids and/or gases to resume normal fl ow. In order to cus- tomise the air cannon installation to the service environment, specifi c air blast characteristics can be achieved by ma- nipulating the operating pressure, tank volume, valve design and nozzle shape. Described as the latest advancement in air cannon valve design, the patent-pending Tornado valve fi res in response to an air pressure surge delivered by a solenoid. The design improves air cannon safety, as discharge requires a positive signal. Unlike negative pressure-fi ring designs, a cannon equipped with the Tornado valve will not discharge accidentally in response to a drop in pressure, so an air supply failure or broken line won’t trigger its fi ring. The positive action of the valve also delivers faster discharge, amplifying output force by as much as 20% over standard air cannon designs. The fast-acting valves can release the tank volume in less than 300 millisec- onds, creating a high-magnitude force at the exit nozzle that’s installed through the wall of the vessel or duct. In addition, the improved air path of the Tornado fi lls the reservoir 3-4 times faster than standard cannons. Since the air cannon installation was completed in February, 2010, no manual cleaning has been needed in the entire preheater tower. Plant offi cials relayed positive references to another Ci- mentas plant in Turkey, leading to a similar system being installed at the Cimentas Elazig plant. ■
For more information visit:
www.martin-eng.com
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52