This page contains a Flash digital edition of a book.
OUR TRACk RECORD


City line tunnel, Stockholm A new 6km rail track is being built under central Stockholm, and we are working on the largest and most complicated section of the tunnel which has seen us produce some of the most complex geotechnical models ever run in Sweden. We also undertook detailed rock investigation and WSP project managed the track, water and waste water installations for the entire tunnel.


excellence in brownfield remediation, Washington D.C. Our work at the new headquarters site for the Department of Transportation saw us implement a remediation plan for the 11- acre site at the Southeast Federal Center in Washington D.C. The project won the 2008 Phoenix Award for excellence in brownfields redevelopment and revitalisation.


Greenest ever store for M&S, uK We helped m&S to open one of their greenest ever stores. We delivered contaminated land and geotechnical investigation services which enabled more than 95% of soil to be reused or recycled as aggregate rather than sent to landfill. WSP was also responsible for the civil and structural engineering.


remediating a 70 year old chemical site, Switzerland We delivered an accelerated site remediation programme at a site in Switzerland which had hosted a chemical production plant for over 70 years. Our programme eliminated the potential for future liabilities and enabled the liability transfer to proceed for the site’s redevelopment.


new Presidential Palaces, Abu Dhabi A new Presidential Palace is being constructed across a 220,000sqm site. As part of the ground works we have designed investigations, earthworks and foundations, and provided specifications for everything from shoring walls to marine construction works.


Central & eastern europe’s largest commercial development The Colosseum Centre in Bucharest will boast retail, leisure and residential facilities. We have provided environmental and geoenvironmental assessments to help ascertain site suitability and the scheme’s detailed design. Given the site’s size, specialist CPT contractors were used as well as standard site investigation to reduce costs for the client.


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20