Easi-Hire Complete software for Hire & Sales companies
Easi-Hire for cost effective control of your business. Thank you for visiting our stand at the Executive Hire Show
Telephone : +353 1 293 8883 Email:
info@jpoint.ie Web:
www.easi-hire.com
NEW LITHIUM BATTERY
TRACCESS 170E VERSION NOW AVAILABLE
FUME, NOISE AND POLLUTION FREE @ 5 hours operating time
As a trusted leader in the portable revolutionised the traditional building
Automatically pumps condensate through 12m of outlet hose and up to a height of 2m. Simply place the outlet hose into a sink or drain - NO MORE OVERFLOWING BUCKETS!
• 13m, 17m and 23m Compact - rugged - reliable - easy to use
tracked access
• Diesel/Petrol/Battery versions • Clean top boom • Minimum exposed components • Strong “stable feel” in use at height
Tel: 0116 286 6743 email:
sales@cte-uk.co.uk
www.ctelift.com
Anti-clog design together with easy open cover ensures performance continues for longer - NO MORE STRUGGLING WITH CLEANING!
Safe, reliable and fast voltage changeover using prewired plug-to-plug cordsets - NO MORE REWIRING PLUGS!
• Unrestricted 200kg basket capacity throughout entire operating area
Large wheels, integral loading skids, robust handle and only 39kg - NO MORE LUGGING DINOSAURS!
2 year warranty, robust rotomoulded cover, build quality you can rely on and service you deserve - NO MORE DENTED, RUSTING METAL BOXES!
2 YEAR WARRANTY 01908 611211 |
WWW.DRI-EAZ.CO.UK
DUAL VOLTAGE 48 LITRES/DAY
- New: 7 models from 1.7 to 5 t operating weight. - Higher productivity, improved efficiency with VDS. - Shorter digging times thanks to vertical digging.
With VDS you‘ll enjoy savings of up to 25%: Thanks to the continuously-variable tilting of the superstructure, gradients of up to 27% can be compensated by the use of a button only. A 20-year pedigree and still as contemporary as ever. Wacker Neuson Limited, Lea Road, Waltham Cross Hertfordshire, EN9 1AW, Tel +44(0)1992 707200
www.wackerneuson.com
Pulverise your excavation costs: With the Vertical Digging System (VDS).
NEW!
25% SAVINGS
on time and materials when excavating and filling-in
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52